Industry

Equipment and service for power generators

Gas turbines of 5–62 MW, turbine generator sets of 2.5–80 MW, microturbines of 110–1,966 kW. Unit control systems on SPPA-T3000, PCS 7 and Russian control platforms, control system migration, turbine service. The team supervised the installation and commissioning of 11 SGT-800 gas turbine units at the Beryoza power plant and Minsk CHP-5 and automated the CHP steam boiler at Knauf Petroboard.

Gas turbine units11× SGT-800Full load15minGas turbines308MW
A gas turbine package at a peaking and reserve power plant

Industry task → our equipment and services

The tasks of a generating company with the matching equipment and services; the data are behind the links
Industry taskEquipmentServices
Peaking and reserve capacityGas turbines 5–62 MWGas turbine service
Steam turbine generationTurbine generator sets 2.5–80 MWSteam turbine service
Distributed generation and small CHPMicroturbinesCogeneration and mini-CHP
Unit controlControl systems on SPPA-T3000, PCS 7 and Russian platformsControl system migration
CommissioningGas turbine control systemsInstallation supervision and commissioning
Reliability between overhaulsSiemens Energy spare partsInspections and diagnostics

Power generation tasks: what to consider when choosing equipment and service

The choice depends on the plant’s operating mode, its steam and heat balance, the scale of generation and the control platform.

Peaking and reserve capacity. A peaking and reserve gas turbine unit spends most of its time on standby and must pick up load quickly: the Russian Rules for the Technical Operation of Power Plants and Networks require intermittently operated gas turbine units to be kept ready to start at all times and to undergo automatic test starts with loading (clause 297). Starts expose hot gas path parts to thermal cycling, so inspections are planned by equivalent operating hours and the number of starts, not by the calendar alone.

Steam turbine generation and CHP. At an industrial CHP plant the turbine is selected to suit the site’s steam and heat balance: a condensing turbine produces more electricity, while a back-pressure or extraction turbine covers the demand for process steam and heat. After individual checks, the boiler control system, turbine governing and protection systems are tested together, at start-up and under load.

Distributed generation. For a company’s own power needs there are microturbines of 110–1,966 kW, including units with waste heat recovery. The choice of unit type depends on the load profile, the fuel and the heat demand; the comparison is in the article “Gas turbine or gas engine genset”.

Unit control. We build and maintain control systems on SPPA-T3000, SIMATIC PCS 7, TIA Portal and the Russian Ezan control platform with Katren and Sonet controllers. Replacing or upgrading the system is planned together with CII categorisation and protection.

Projects

Letters of appreciation

The team’s track record at power plants and CHP plants

Customers for whom the company’s specialists have supplied and commissioned equipment and systems include Inter RAO.

The table lists only work confirmed by project pages, news items and customer letters.

The team’s work in power generation
SiteWhat was doneConfirmed facts
Beryoza power plant and Minsk CHP-5 (Belenergo)installation supervision and commissioning supervision of 11 SGT-800 gas turbine units for peaking and reserve power sourceswork began in 2023; in November 2023 the first unit at Minsk CHP-5 was synchronised with the grid, and at the Beryoza power plant three units were connected and integrated testing of the first stage of the power unit began
Kirov CHP-3 (Kirovsky branch of T Plus)maintenance of the gas turbine control system under a technical support contractletter of 20 March 2025, translated from Russian: “…the conclusions and recommendations […] made it possible to achieve highly efficient operation of the gas turbine control system and of the System as a whole, as well as its failure-free operation”
Knauf Petroboard CHP plant, Kommunarcontrol system for the new E-100-3.9-440 GM steam boiler: application software on SIMATIC PCS 7, control cabinets, factory acceptance tests, commissioningat the end of 2023 the company’s specialists took part in tests of the boiler made by Belenergomash-BZEM (letter of 5 February 2024); under GOST 3619-89 the designation stands for natural circulation, 100 t/h of steam, 3.9 MPa (abs.), 440 °C, gas and fuel oil firing
Yamal LNG captive power plantsupply, installation, commissioning and maintenance of 8 SGT-800 gas turbine unitsengineers continue to maintain the gas turbines above the Arctic Circle

Russian Energy Forum. At the 25th forum (Ufa, 1–3 October 2025) the company and Turbinaspetsservis Production Enterprise LLC gave a joint presentation on service during the overhaul of SGT-700 gas turbines, based on the overhaul of two turbines of unit 5 at the Beryoza power plant of RUE Brestenergo. The presentation was given at a round table on import substitution, whose topics included the thermal generation modernisation programme.

Training for power engineers. Company specialists held classes for students of the St Petersburg Power Engineering Institute for Advanced Training (PEIPK), who work for energy companies and thermal power plants, on instrumentation and control, automatic control and process control systems at thermal power plants (the institute’s letters of 2024). We provide the customer’s staff with training in operation and maintenance under an agreed programme.

What makes it different

  1. Reserve

    Capacity in minutes

    The SGT-800 gas turbine units of peaking and reserve plants reach full load in 15 minutes; the team supervised the installation and commissioning of 11 such units.

  2. Controls

    Unit control on any platform

    SPPA-T3000, SIMATIC PCS 7 and Russian control platforms; migration of running systems without a long outage of the plant.

  3. Scale

    From a microturbine to a power unit

    Microturbines with heat recovery (cogeneration) for a company’s own needs, turbine generator sets for CHP plants, large gas turbines for power stations.

Industry regulations for work at a power plant

Besides the manufacturer’s documentation, work on generating equipment is governed by industry regulations.

Regulatory requirements for work on generating equipment (general information)
DocumentWhat it requires
Rules for the Technical Operation of Power Plants and Networks of the Russian Federation (Russian Ministry of Energy Order No. 1070 of 4 October 2022)before a gas turbine unit is started after a repair lasting more than 3 days, the main and auxiliary equipment, instrumentation, controls, protection and interlocks are checked for serviceability and readiness (clause 286); the gas turbine governing system is tested by instantaneous load rejection (the generator is disconnected from the grid) at acceptance after installation, after a reconstruction that changes the characteristics of the unit or of the governing system, and when changes in the governing characteristics are found in operation or during repair (clause 296)
Rules for Organising the Maintenance and Repair of Electric Power Facilities (Russian Ministry of Energy Order No. 1013 of 25 October 2017)apply to power plants with an installed capacity of 5 MW and above (except nuclear plants), including the hardware and software of process control systems; after repair, acceptance tests are carried out in two stages, at start-up and under load (clauses 1, 2, 100 and 101)
Rules for Taking Electric Power Facilities out for Repair and out of Operation (Russian Government Resolution No. 86 of 30 January 2021)proposals for the consolidated annual repair schedule are submitted by 30 June of the preceding year, and the System Operator approves the schedule by 31 August; the consolidated monthly schedule is approved by the 24th of the preceding month; equipment is taken out for repair under a dispatch request (clauses 10, 15, 21 and 25)
Federal Law No. 187-FZ and Presidential Decree No. 166 of 30 March 2022a power plant’s process control system is a critical information infrastructure (CII) object in the energy sector and is categorised by the CII subject; since 1 January 2025 customers under Federal Law No. 223-FZ (other than organisations with municipal participation) have been prohibited from using foreign software on significant CII objects they own, unless otherwise provided by federal law

Questions and answers

Which gas turbines do you supply?

Siemens Energy SGT-100 – SGT-800 gas turbines of 5–62 MW for power generation and mechanical drive. We service industrial gas turbines of small and medium output, including SGT-800.

Which platform is the unit control system built on?

On SPPA-T3000, SIMATIC PCS 7 or Russian control platforms, as the customer requires; we also migrate running systems.

What did you do for Belenergo?

Installation and commissioning supervision of 11 SGT-800 <a class="term-link" href="../glossary/gas-turbine-unit/index.html" title="What is a gas turbine unit (GTU)">gas turbine units</a> at the Beryoza power plant and Minsk CHP-5.

Do you work at operating power plants or only on new projects?

Both. On new projects we provide installation and commissioning supervision; this is how the SGT-800 gas turbine units of Belenergo’s peaking and reserve power sources were brought into service. At operating plants we maintain equipment and control systems: the company’s engineers carried out maintenance of the gas turbine control system at Kirov CHP-3 under a technical support contract. Work on shut-down equipment is planned around the plant’s outage window.

What should a service request for power plant equipment include?

The machine type and model, serial number, operating hours and number of starts since the last overhaul, the control platform and its version, a description of the fault or the scope of work required, and the planned outage window from the plant’s repair schedule. If you have reports from previous inspections or vibration and temperature trends, attach them: this makes the work programme and the spare parts list more accurate.

CallSend a request