Process control systems for power and industry: from design to commissioning
We implement and upgrade turnkey control systems for power plants and industry: from architecture and equipment supply to commissioning. We work with power facilities, control systems of rotating equipment, energy centres, cement works and pulp and paper mills, built on SPPA-T3000, SIMATIC PCS7, TIA Portal and the Russian Ezan platform with Katren and Sonet controllers. We combine international engineering experience with Russian design standards.

Facilities we automate

- power facilities
- rotating equipment
- energy centres
- cement works
- pulp and paper mills
Standard solutions
Control systems for steam and gas turbines and compressors
Turnkey control systems for critical rotating equipment: high-precision control, modern protection subsystems and vibration monitoring for stable operation of turbines and compressors.
Process control import substitution: migration from SPPA-T3000 and PCS7
Safe transition of power facilities to the Russian Ezan platform: we transfer the algorithms, protections and control loops and provide technological independence and reliable support.
Anti-surge control
Anti-surge protection and capacity control systems for compressors.
Digital twins and simulators
Equipment models for debugging control systems and training personnel; a digital model of a 2.4 MW steam turbine (2024).
Integrated plant automation
Development, implementation and maintenance of automation systems. A reliable partner at every stage of your control system’s life cycle.
Integrated supply of process control equipment
We select and supply equipment for your control system.
Control platforms and import substitution
We build and support control systems on three Siemens platforms, on the Russian Ezan control platform and on the Russian ELSI-TMK, ELSI-MKS and REGUL controllers. An existing system is supported on its own platform; when an imported platform is replaced, the Ezan platform is our target choice.
| Platform | What it is | Typical use |
|---|---|---|
| Siemens Energy SPPA-T3000 | distributed control system (DCS) for power plants; the manufacturer now markets it as Omnivise T3000 | power units, turbine sets, boilers |
| SIMATIC PCS7 | distributed control system for continuous and batch process industries | process units, industrial boilers and energy centres |
| TIA Portal | Siemens engineering framework for programming SIMATIC S7 controllers and operator panels and configuring SINAMICS drives | control systems for units, machines and multi-motor drives |
| Ezan platform | Russian Sonet and Katren controllers for multi-level distributed process control systems; both are made by EZAN JSC (Chernogolovka) and both support hot standby controller redundancy | power facilities and industrial plants, with Katren also used in the oil and gas sector |
| ELSI-TMK and ELSI-MKS PLCs | Russian programmable logic controllers made by EleSy JSC (Tomsk) | control systems for units and auxiliary equipment, local automation systems |
| REGUL PLCs | Russian programmable logic controllers made by Prosoft-Systems LLC (Yekaterinburg) | process and turbine control systems, emergency shutdown systems |
Support for existing systems. The company has a test bench with controller, server and communication equipment and every version of the SPPA-T3000 software available in Russia. It is used to test antivirus database updates and Kaspersky Industrial Cyber Security software updates for compatibility with PCS7 and SPPA-T3000 systems before they are installed on site.
Moving to a Russian platform. Since 1 January 2025, Presidential Decree No. 166 of 30 March 2022 has prohibited state authorities and customers purchasing under Federal Law 223-FZ from using foreign software on the significant critical information infrastructure (CII) facilities they own. At such facilities an imported platform is replaced with a Russian one. The transferred protection and control algorithms are first tested on the bench and then put into service on site. The procedure is described on the migration from SPPA-T3000 and PCS7 to a Russian control platform page.
Projects

Akkuyu NPP: high-voltage testing of 400 kV GIS and SF6 bus ducts
400 kV GIS · 400 kV SF6 bus ducts

Arctic LNG 2: installation and commissioning of feed gas and boil-off gas compressors
feed gas compressors · boil-off gas compressors

Belenergo: installation and commissioning supervision of 11 SGT-800 gas turbine units
11 × SGT-800 · full load in 15 minutes

Ilim: board machine control system in Ust-Ilimsk
board machine of 600,000 tonnes a year · 2023

Knauf Petroboard: CHP steam boiler automation
steam boiler control system on SIMATIC PCS7

Rosseti: GIS for the 220 kV TsRP substation in Krasnoyarsk
1,920 sets of GIS equipment

USC: electrical equipment for three fishing vessels
3 vessels · power distribution and monitoring system based on PMA300 · 2020–2023

Yamal LNG: eight SGT-800 gas turbines, boil-off gas compressors and 29 modular substations
8 × SGT-800 · 4 boil-off gas compressors · 29 modular substations
What we have delivered in automation projects
The table covers control systems for boilers, a board machine and a gas turbine unit, from application software and cabinets to commissioning and maintenance. Each row is backed by a letter from the customer or the equipment manufacturer or supplier, a company news item or the company’s project description.
| Facility | What we did | Document |
|---|---|---|
| E-100-3.9-440 GM steam boiler, Knauf Petroboard CHP plant, Kommunar | design of the control system application software on SIMATIC PCS7, supply and assembly of the control cabinets, factory acceptance tests; participation in the boiler tests at the end of 2023 | letter from the boiler manufacturer Belenergomash-BZEM LLC No. 018-0042 of 5 February 2024; company project description |
| Board machine producing 600 thousand tonnes a year, Ilim Group’s Ust-Ilimsk pulp and board mill | commissioning of the control system with industry libraries and of the software for synchronising and protecting the multi-motor drives, soft starters and variable-frequency drives; completed in 2023 | letter from FPPT (Voith Paper Technology Russia), published 5 February 2024; company project description |
| Two Titan M boiler units at Nezhinsky GOK (mining and processing plant), Belarus | 2025 contract: design, manufacture and delivery of the control systems; 2026 contract: installation supervision and commissioning | company news of 9 June 2025 and 16 March 2026 |
| Gas turbine control system at Kirov CHP-3, Kirovsky branch of T Plus PJSC | maintenance under a 2023 technical support contract; consultations and service reports with conclusions and recommendations | letter from Kirov CHP-3 No. 50300-27-00079 of 20 March 2025 |
The boiler manufacturer for Knauf Petroboard wrote that “the engineering and commissioning work on the process control system was carried out to a consistently high standard of quality”. Scans of the letters are on the customer letters of appreciation page.
Process control system design: stages and documents
A process control system is designed in stages which, since 30 April 2022, have been set by the Russian national standard GOST R 59793-2021; it replaced GOST 34.601-90. The technical specification follows GOST 34.602-2020, the types and set of documents GOST 34.201-2020, and their content GOST R 59795-2021. The stages and steps for a particular facility are fixed in the contract and the technical specification.
| Stage | What is done | Result for the customer |
|---|---|---|
| 1–2. Requirements and concept | facility survey, user requirements, concept options, risk assessment | reports on the work done, the selected concept option |
| 3. Technical specification | development and approval of the specification for the system and its parts | approved specification |
| 4–5. Outline and technical design | system architecture and functions, types of support, documentation for procuring components, design assignments for related sections of the project | design decisions and documentation |
| 6. Working documentation | working documentation, development or adaptation of individual types of system support, including software | documents for installation, commissioning and operation |
| 7. Putting into operation | preparation of the facility and personnel training, procurement of components, installation, commissioning, preliminary tests, trial operation, acceptance tests | a system accepted into operation |
| 8. Support | rectification of defects found in operation, analysis of system performance and updates to the documentation | support of the system in operation |
If the process control system is part of a capital construction project, its sections are included in the facility’s design and working documentation. Energy Management has been a member of the ENERGOPROEKT Association, a self-regulatory organisation (SRO) for design, since 16 February 2024; the register extract is on the licences, approvals and SRO membership page.
What to send for an estimate. For a technical and commercial proposal, please send:
- the equipment list and the facility’s process flow diagram;
- details of the existing system: platform, software versions, year of commissioning, documentation;
- the signal list, or the number of signals by type: analogue, digital, communication;
- the technical specification or a list of functions and interfaces with related systems;
- planned outage windows and information security requirements, including the CII significance category if one has been assigned.
Process control cabinets: contents and factory acceptance tests
A process control cabinet is the hardware part of the system: controllers, I/O modules, power supply and communications in one enclosure. Cabinets are assembled to the working documentation and checked in factory acceptance tests before shipment to site.
What a cabinet usually contains
- a controller, with redundant processors and power supplies for protection functions;
- analogue and digital I/O modules and communication modules for industrial protocols;
- power supply units, uninterruptible power supplies and circuit breakers;
- interposing relays, intrinsic safety barriers for sensor circuits in hazardous areas, and terminal blocks;
- industrial network switches, cabinet heating and ventilation;
- spare channels and space as set out in the technical specification.
Factory acceptance tests (FAT) confirm that the system meets its specification before installation. IEC 62381:2024 describes the procedure for factory tests as well as for site acceptance and integration tests. The checks usually cover:
- completeness, marking and assembly of the cabinets against the documentation;
- power-up and switchover to standby;
- every I/O channel, using simulated signals;
- protection, interlock and control algorithms, on a simulator or a digital model of the equipment;
- data exchange with operator stations and related systems.
The results are recorded in a test report, and findings are resolved before shipment.
Training for engineers and customer personnel
Engineers of the process control division have completed three courses run by INT, the R&D centre of EleSy JSC: Integrity SCADA administration, project development on Integrity SCADA, and programming of the ELSY-MKS controller, including work with a redundant controller.
Personnel training is a separate step in putting a system into operation under GOST R 59793-2021: staff are trained and their ability to keep the system running is checked. We train customer personnel to an agreed programme and, for hands-on practice, develop process control simulators that imitate the real facility and run in a single environment with the control platform. There is more on the customer personnel training page.
Specialists of the process control and drives department have also run classes for students of the St Petersburg Energy Institute of Professional Development (PEIPK) in groups on the operational control of the main equipment of thermal power plants and of electrical networks. The institute thanked them in a letter of 17 December 2024.
Control system protection under Federal Law 187-FZ
Categorisation of critical information infrastructure, design and rollout of protection and a test bench for security tools — delivered together with the automation project.
CII categorisationRelated
Questions and answers
Can you move from SPPA-T3000 to a Russian platform without stopping production?
The <a class="term-link" href="../glossary/control-system-migration/index.html" title="What is control system migration to a Russian platform">migration</a> runs in stages: the algorithms are transferred to the Ezan platform with the protections and control loops preserved, and the changeover happens during planned outages. There is more on the migration page.
Do you design to Russian standards?
Yes: the engineering follows Russian standards and is done by specialists with international experience.
Which facilities do you build control systems for?
Power facilities, rotating equipment (turbines and compressors), energy centres, cement works and pulp and paper mills.
What is a digital twin in a control system?
A model of the equipment used to debug the control system and train personnel before start-up. In 2024 the testing of a digital model of a 2.4 MW <a class="term-link" href="../glossary/steam-turbine/index.html" title="What is a steam turbine">steam turbine</a> was completed.
How is the control system protected?
Network segmentation, access control and the measures required by Federal Law <a class="term-link" href="../glossary/critical-information-infrastructure/index.html" title="What is critical information infrastructure and its categorisation">187-FZ</a>; the security tools are checked on our own test bench. There is more in the IT and cybersecurity section.
How many stages does a process control system project have, and can they be reduced?
GOST R 59793-2021 sets out eight stages: requirements, concept, technical specification, outline design, technical design, working documentation, putting into operation and support. The standard allows the outline design to be omitted, the technical design and working documentation to be combined into a single detailed design, individual steps to be left out and some steps to run in parallel.
Do you support SPPA-T3000 and PCS7 systems without moving to a new platform?
Yes. We carry out diagnostics, fault rectification and changes to the application software, and we test Kaspersky Industrial Cyber Security updates for compatibility on our own test bench before they are installed. The timing of the move to a Russian control platform is agreed with the facility’s outage schedule. For significant CII facilities of state authorities and 223-FZ customers, the ban on foreign software under Decree No. 166, in force since 1 January 2025, is taken into account.
Does a contractor need SRO membership to design a process control system?
Yes, if the system is designed as part of a capital construction project under a contract with a developer or technical client: as a general rule, such contracts may only be performed by members of an SRO for architectural and construction design (Article 48(4) of the Russian Town Planning Code). Energy Management has been a member of the ENERGOPROEKT Association since 16 February 2024 and may prepare design documentation for capital construction facilities other than especially hazardous, technically complex, unique and nuclear facilities.
Engineering team
Process control systemsPlatform and product names are used to identify the systems we service. Trademarks belong to their respective owners. Energy Management LLC is an independent engineering company.