Project · Shipbuilding · Vyborg

USC: electrical equipment for three fishing vessels

Vessels3Barentsevo More, Norvezhskoe More, Beloye More Period2020–2023 Monitoring systemPMA300control, monitoring, diagnostics Ship ownerArkhangelsk Trawl Fleet
Illustration: the KMT01 trawler Beloye More at the quay

Project data

Customer
USC — Vyborg Shipyard
Facility
3 fishing vessels for the Arkhangelsk Trawl Fleet
Region
Vyborg
Industry
shipbuilding
Types of work
supply · commissioning
Period
2020–2023

The task

The Vyborg Shipyard (United Shipbuilding Corporation) was building three fishing vessels for the Arkhangelsk Trawl Fleet — the Barentsevo More, the Norvezhskoe More and the Beloye More. The team’s task was to supply and commission the vessels’ power distribution and monitoring system.

About the facility: KMT01 factory trawlers

The Barentsevo More, the Norvezhskoe More and the Beloye More are the first three of a series of four KMT01 factory trawlers that the Vyborg Shipyard built for Arkhangelsk Trawl Fleet JSC under Russia’s investment quota programme. Each trawler is 86 m long and 17 m wide and is classed KM Ice3 AUT1 by the Russian Maritime Register of Shipping. The on-board factory processes up to 160 tonnes of raw fish a day. The shipyard delivered the vessels to the owner in 2020, 2021 and January 2023.

The AUT1 automation mark means that the machinery can operate without permanent attendance in the machinery spaces and the central control room. The Register’s rules therefore require an automated power plant: the generators are synchronised and take up and share the load automatically. More on a trawler’s electrical power system and the Register’s requirements is on the shipbuilding industry page.

What we did

  1. Supply

    Power distribution

    Switchboards, transformers, voltage converters and starters for the three vessels.

  2. Supply

    Control, monitoring and diagnostics

    A control, monitoring and diagnostics system for the electrical equipment based on PMA300.

  3. Commissioning

    Commissioning on board

    Commissioning of the power distribution and monitoring system on each of the three vessels during outfitting and trials.

What the system comprises and what each part does

The power distribution and monitoring system links the trawler’s generators with the consumers, from the engine room machinery to the refrigeration plant and the fish factory’s processing lines.

Equipment of the power distribution and monitoring system
EquipmentRole on board
Switchboardsreceive power from the generators, distribute it to the consumers and protect the circuits against overload and short circuit
Transformerssupply networks at other voltages, such as the lighting network
Voltage converterssupply consumers that need a different voltage level or type of current
Startersswitch electric motors on and off and protect them; for large motors they also limit the starting current so that starting does not cause unacceptable voltage and frequency dips in the ship’s network
Control, monitoring and diagnostics system based on PMA300controls the power distribution system, monitors its parameters and the condition of the electrical equipment, and raises alarms on deviations

The result

In 2020–2023 the shipyard handed over all three vessels to the Arkhangelsk Trawl Fleet with the power distribution and monitoring system supplied and commissioned.

Feedback from the ship owner

The ship owner, Arkhangelsk Trawl Fleet JSC, described the work of the company’s specialists on the third vessel, the trawler Beloye More, in its letter (translated from Russian):

“In 2023 the specialists of Energy Management LLC carried out work on the power distribution and monitoring system for the fishing trawler Beloye More, project KMT01. With their involvement the vessel successfully completed sea trials and was handed over for operation. This is already the third vessel in the KMT01 trawler series.”

The shipyard delivered the first two vessels before Energy Management LLC was founded in 2022: the supply and commissioning of the system on them were handled by our team, which has worked in the Russian power industry since 1996 (see the company history). The scan of the letter is in the letters of appreciation section, and the letter was announced in a news item of 26 January 2024.

The trawler Norvezhskoe More at the quay in winter
Illustration. The trawler Norvezhskoe More at the quay in winter

Equipment and services in this project

Similar projects