Company

History of the company and the team

The team has worked in the Russian power industry since 1996: centrifugal compressor manufacturing in Perm, large gas turbine manufacturing in St Petersburg, power transformer manufacturing in Voronezh. Since 2022 it has been an independent Russian company, Energy Management LLC.

Timeline

  1. 1996

    The team starts work in Russia: the Siemens AG representative office is established (Siemens LLC).

  2. 2010

    Centrifugal compressor manufacturing plant in Perm (RusTurboMash LLC).

  3. 2011

    Large gas turbine manufacturing plant in St Petersburg (STGT LLC).

  4. 2012

    Power transformer manufacturing plant in Voronezh (Siemens Transformers LLC).

  5. 2020

    The power business is carved out into Siemens Energy (in Russia: Oil, Gas and Power LLC).

  6. 2022

    An independent Russian company is formed — Energy Management LLC.

  7. 2023

    Start of independent operations; website launch; entry in the register of potential suppliers of the Gazprom Group.

  8. 2024

    SRO membership (design); partnership agreements with equipment manufacturers; the high-voltage test laboratory registered with Rostechnadzor.

  9. 2025

    Two trademarks registered; SRO membership (construction).

  10. 2026

    Responsible Business Mark; new contracts.

The names of the predecessor companies are given as historical facts. Trademarks belong to their respective owners; Energy Management LLC is an independent company.

From the team’s experience to an independent company

The timeline before 2022 is the history of the team’s experience, not of the company. The core of the team worked in the Russian operations of Siemens and, from 2020, of Siemens Energy. On 27 June 2022 Energy Management LLC was formed as an independent Russian legal entity. Since 2023 the company has run its own business: it signs contracts and obtains approvals and licences in its own name. The team has kept its knowledge and experience in supplying and servicing gas and steam turbines, compressors, high-voltage equipment and automation systems.

Milestones, 2023–2026

In November 2023 the first SGT-800 gas turbine unit at Minsk CHP-5 was synchronised with the grid under the supervision of the company’s specialists; by then three units at the Beryoza power plant had already been connected to the grid under their supervision. In total, the company provided installation and commissioning supervision for 11 SGT-800 units at the two plants on the Belenergo project. In 2025–2026 contracts were signed for the control systems of two steam boilers at Nezhinsky GOK (mining and processing plant) in Belarus: first for design, manufacture and delivery, then for installation supervision and commissioning.

In 2024 the company joined the ENERGOPROEKT self-regulatory organisation (SRO) for design, obtained an FSTEC of Russia licence for technical protection of confidential information, received representative and partner certificates from Qingdao Herui Compressor, New JCM Group and Hangzhou Chinen Turbomachinery and signed cooperation documents with Hunan Liyu Gas Power (Partners). In 2025 it received ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates, joined the EnergoStroyAlliance SRO for construction and registered two trademarks. In 2026 the company has more than 100 employees and five offices.

Related

CallSend a request