Industries

Industry solutions

Equipment and service for nine industries: from LNG plants above the Arctic Circle to fishing vessels and board machines. Each industry page sets out its tasks and how we meet them: the equipment, the services and the projects.

Industries

Electrical equipment and automation for shipbuilding

Electrical equipment and automation for shipbuilding

Shipboard power distribution and monitoring systems: switchboards, transformers, converters, starters, the PMA300 control, monitoring and diagnostic system. The team supplied and commissioned the electrical equipment of three fishing vessels built by the Vyborg Shipyard (USC) for the Arkhangelsk Trawl Fleet in 2020–2023.

Read more
Equipment and service for grid companies

Equipment and service for grid companies

GIS 110–550 kV, dead-tank and live-tank SF6 circuit breakers, an assembly facility for up to 350 breakers a year. Service for 110–750 kV high-voltage equipment: inspections, diagnostics on request or after 12 years, major repair on request or after 25 years of operation, emergency stock. A test laboratory rated up to 750 kV. Reference: installation and commissioning of the GIS at the 220 kV TsRP substation in Krasnoyarsk (Rosseti — Siberia Trunk Grids).

Read more
Equipment and service for LNG plants

Equipment and service for LNG plants

Captive power plants on gas turbines, feed gas and boil-off gas compressors, modular substations and GIS — together with service over the whole life in Arctic conditions. The team supplied, erected and now maintains eight SGT-800 gas turbines, four boil-off gas compressors and 29 modular substations at Yamal LNG; at Arctic LNG 2 the feed gas and boil-off gas compressors are being installed and commissioned under the supervision of the company’s specialists.

Read more
Equipment and service for power generators

Equipment and service for power generators

Gas turbines of 5–62 MW, turbine generator sets of 2.5–80 MW, microturbines of 110–1,966 kW. Unit control systems on SPPA-T3000, PCS 7 and Russian control platforms, control system migration, turbine service. The team supervised the installation and commissioning of 11 SGT-800 gas turbine units at the Beryoza power plant and Minsk CHP-5 and automated the CHP steam boiler at Knauf Petroboard.

Read more
Equipment and service for the oil and gas industry

Equipment and service for the oil and gas industry

Gas turbines driving compressors and pumps, centrifugal and reciprocating compressors for hydrocarbons, syngas and associated gas, dry gas seals. Turbine and compressor service, resident engineers on site, spare parts and anti-surge control. The team’s Arctic track record is at the Yamal LNG and Arctic LNG 2 plants.

Read more
Equipment for metals and mining

Equipment for metals and mining

Centrifugal compressors to API 617 rated up to 30 MW, blowers and fans to API 673 up to 5 MW, steam turbines, boiler control systems; high-voltage substation equipment. The 220 kV TsRP substation in Krasnoyarsk, where our specialists took part in the erection and commissioning of the GIS, feeds the Krasnoyarsk aluminium and metallurgical plants. For Nezhinsky GOK the company designed, manufactured and delivered the control systems of two boiler units (2025 contract); in 2026 a contract was signed for their installation supervision and commissioning.

Read more
Equipment for refining and petrochemicals

Equipment for refining and petrochemicals

Compressors for hydrocarbons, syngas, ethylene, propylene and hydrogen: centrifugal up to 15 MPa, API 618 reciprocating up to 50 MPa, diaphragm up to 45 MPa for hydrogen and aggressive gases, screw compressors to API 619. API 611/612 mechanical drive steam turbines and small RLA, RLVA and RLH turbines for pump and fan drives. Service and spare parts for Siemens Energy and Dresser-Rand equipment.

Read more
Service and equipment for nuclear power

Service and equipment for nuclear power

High-voltage equipment, high-voltage testing and service for nuclear power facilities. The team’s work has been acknowledged by Novovoronezh NPP, a branch of Rosenergoatom Concern JSC (2025), and Akkuyu Nuclear JSC (2025): the letters of appreciation are published in the news.

Read more
Solutions for the pulp and paper industry

Solutions for the pulp and paper industry

Control systems for paper and board machines, multi-motor drives, soft starters and variable frequency drives; steam turbines for mill CHP plants; boiler control systems. The team commissioned the control system and drives of the board machine in Ust-Ilimsk for Ilim and automated the CHP steam boiler at Knauf Petroboard.

Read more

What tasks in different industries have in common

Customers in different industries share three tasks: reliable equipment operation, service without direct manufacturer support and import substitution. What differs is process media, climate and regulations — each industry page covers them together with an “Industry task → our equipment and services” table and questions and answers; projects and customer letters are shown where the work is confirmed by documents.

  • Reliability: inspections, maintenance, repairs and spare parts throughout the equipment life cycle.
  • Service without direct manufacturer support: the control system is checked on a model of the machine before work on site; for example, testing of the digital model of a 2.4 MW Howden steam turbine was completed to prepare the control system for commissioning.
  • Import substitution: we also build control systems on the Russian Ezan control platform with Katren and Sonet controllers and offer migration from SPPA-T3000 and PCS 7 to it; we migrate IT infrastructure to Russian platforms.

Customers and sites by industry

The table lists only work confirmed by project pages, news items and letters of appreciation; scans of the letters are in the Letters of appreciation section.

The team’s track record by industry
IndustryCustomers, sites and work
LNGYamal LNG: supply, installation, commissioning and maintenance of 8 SGT-800 gas turbines, 4 boil-off gas compressors and 29 modular substations; Arctic LNG 2: installation supervision and commissioning of feed gas and boil-off gas compressors
Oil and gasGSP Remont LLC: scheduled Level 1 inspection of two Siemens STC-SV turbocompressors at a Gazprom Pererabotka plant, 2023
Petrochemicals and refineriesno project descriptions on the site yet
Power generationinstallation and commissioning supervision of 11 SGT-800 gas turbine units (Belenergo); maintenance of the gas turbine control system at Kirov CHP-3
Power gridsparticipation in the installation and commissioning of the GIS at the 220 kV TsRP substation (Rosseti — Siberia Trunk Grids)
Pulp and paper industrycommissioning of the control system and drives of Ilim’s board machine; automation of the new steam boiler at the Knauf Petroboard CHP plant
Metals and miningcontrol systems for two boiler units at the Nezhinsky mining and processing plant (Nezhinsky GOK): design, manufacture and delivery under a 2025 contract, and a 2026 contract for installation supervision and commissioning
Shipbuildingsupply and commissioning of electrical equipment for three fishing vessels built by the Vyborg Shipyard for the Arkhangelsk Trawl Fleet
Nuclear powerhigh-voltage tests of the 400 kV GIS at Akkuyu NPP; participation in the emergency replacement of a 500 kV circuit breaker at Novovoronezh NPP-2

Customers for whom the company’s specialists have supplied and commissioned equipment and systems include Gazprom, SIBUR, LUKOIL, Rosneft, NOVATEK, CPC, Inter RAO, Rosseti, Russian Railways and Uralkali.

Related

CallSend a request