Customer letters of appreciation
Letters from customers about work completed: nuclear power plants, generating and engineering companies, shipbuilders and training centres. We publish scans of the letters and extracts from them; click a scan to enlarge it. The letters are in Russian.
Letters
Akkuyu Nuclear JSC (Rosatom)
For: high-voltage tests with partial-discharge measurement of the 400 kV GIS and 400 kV gas-insulated busducts during…
Full letter description
high-voltage tests with partial-discharge measurement of the 400 kV GIS and 400 kV gas-insulated busducts during energisation of the right-hand part of the 400 kV GIS at Akkuyu NPP. Letter dated 22.12.2025, No. 2-СЕ/49068.
“AKKUYU NÜKLEER ANONİM ŞİRKETİ expresses its gratitude to Energy Management LLC for the high professionalism and quality of the services provided in carrying out high-voltage tests with partial-discharge measurement of the 400 kV GIS and the 400 kV gas-insulated busducts…”
Translated from Russian
Novovoronezh NPP, a branch of Rosenergoatom Concern JSC
For: prompt, high-quality emergency repair work to replace a circuit breaker at the 500 kV Donskaya substation of unit 2 of…
Full letter description
prompt, high-quality emergency repair work to replace a circuit breaker at the 500 kV Donskaya substation of unit 2 of Novovoronezh NPP-2. Letter dated 21.11.2025, No. 9/Ф0701/203022.
“Effective action in repairing the 500 kV switchgear made it possible to avoid downtime of the main equipment and to prevent any reduction in power output.”
Translated from Russian
Akkuyu Nuclear JSC (Rosatom)
For: high professionalism, responsibility and promptness in the high-voltage tests of the 400 kV GIS with partial-discharge…
Full letter description
high professionalism, responsibility and promptness in the high-voltage tests of the 400 kV GIS with partial-discharge measurement (bay No. 13 and the section busbars of the right-hand part of the GIS) at the Akkuyu NPP site.
“I would like to note the well-coordinated work of the team of supervising engineers on the tests at the Akkuyu NPP site, their readiness to accommodate the Customer’s wishes, their diligence and their ability to find solutions in difficult situations in order to meet the work deadlines.”
Translated from Russian
Kirov CHP-3, Kirovsky branch of T Plus PJSC
For: service and maintenance of the gas turbine control system at Kirov CHP-3.
Full letter description
service and maintenance of the gas turbine control system at Kirov CHP-3. Letter dated 20.03.2025, No. 50300-27-00079.
“The work performed by your organisation’s specialists, together with the conclusions and recommendations provided in consultations and service reports, made it possible to achieve highly efficient operation of the gas turbine control system and of the System as a whole, as well as its failure-free operation.”
Translated from Russian
St Petersburg Energy Institute of Professional Development (PEIPK)
For: training sessions run by the process control and drives department for students of the power plant and grid groups.
Full letter description
training sessions run by the process control and drives department for students of the power plant and grid groups. Letter dated 17.12.2024, No. 01-11/755.
“We thank the specialists of the process control and drives department of Energy Management LLC […], who demonstrated in-depth knowledge, extensive practical experience and great teaching skill in conducting the classes.”
Translated from Russian
St Petersburg Energy Institute of Professional Development (PEIPK)
For: training sessions for representatives of energy companies.
Full letter description
training sessions for representatives of energy companies. Letter dated 27.06.2024, No. 1-14/569.
“The overall impression of the training is positive. The topics were covered in full, the material was presented clearly, and the lecturer demonstrated in-depth knowledge and great teaching skill.”
Translated from Russian
GSP Remont LLC
For: scheduled Level 1 inspection of two Siemens STC-SV turbocompressors at the Gazprom Pererabotka gas condensate treatment…
Full letter description
scheduled Level 1 inspection of two Siemens STC-SV turbocompressors at the Gazprom Pererabotka gas condensate treatment plant. Letter dated 06.10.2023, No. 15520.
“The work was carried out in accordance with the requirements of the regulatory and technical documentation, at a high organisational and technical level and within the time frame set by the contract. We note the high qualifications of your company’s staff and express our gratitude for the high-quality performance of the work.”
Translated from Russian
Belenergomash-BZEM LLC
For: implementation and testing of the boiler automation system at the Knauf Petroboard CHP plant.
Full letter description
implementation and testing of the boiler automation system at the Knauf Petroboard CHP plant. Letter dated 05.02.2024, No. 018-0042.
“Despite the difficulties caused by the enforced reorganisation of Siemens Energy in Russia, the engineering and commissioning work on the process control system was carried out to a consistently high standard of quality.”
Translated from Russian
FPPT (Voith Paper Technology Russia)
For: contribution to the start-up of the board machine at the Ust-Ilimsk pulp and board mill: commissioning of the control…
Full letter description
contribution to the start-up of the board machine at the Ust-Ilimsk pulp and board mill: commissioning of the control system and drives.
“The commissioning of the control system and drives was carried out by the specialists of Energy Management LLC to the highest professional standard…”
Translated from Russian
Arkhangelsk Trawl Fleet JSC
For: commissioning of the power distribution and monitoring system of the fishing trawler Beloye More, project KMT01.
Full letter description
commissioning of the power distribution and monitoring system of the fishing trawler Beloye More, project KMT01.
“In 2023 the specialists of Energy Management LLC carried out work on the power distribution and monitoring system for the fishing trawler Beloye More, project KMT01. With their involvement the vessel successfully completed sea trials and was handed over for operation.”
Translated from Russian