Energy Management LLC is a Russian engineering and service company. We supply, install, commission and maintain gas and steam turbines, compressors, high-voltage equipment and control systems. The company was founded in 2022, employs more than 100 specialists and has offices in five cities. It is not related to ISO 50001 energy management systems.
the team has worked in Russian power engineeringsince 1996the company was founded2022employeesmore than 100offices in Russia5countries: Russia, Belarus, Kazakhstan, Uzbekistan4
Message from the General Director
Oleg V. Titov
General Director
“Dear colleagues and friends! We are glad to put every effort into the successful delivery of our customers’ projects!”
We have managed to keep the knowledge and the long experience of supplying and maintaining gas and steam turbines, compressors, high-voltage equipment and automation systems for a range of industries. Over many years of work we have learned to adapt the processes and working methods of foreign manufacturers to national requirements and to the specifics of Russian projects. We put all of our competence into developing and supporting the projects of domestic customers.
Large gas turbine manufacturing plant in St Petersburg (STGT LLC).
2012
Power transformer manufacturing plant in Voronezh (Siemens Transformers LLC).
2020
The power business is carved out into Siemens Energy (in Russia: Oil, Gas and Power LLC).
2022
An independent Russian company is formed — Energy Management LLC.
2023
Start of independent operations; website launch; entry in the register of potential suppliers of the Gazprom Group.
The names of the predecessor companies are given as historical facts. Trademarks belong to their respective owners; Energy Management LLC is an independent company.
Key facts about the company
Full name
Energy Management Limited Liability Company
Short name
Energy Management LLC
Taxpayer number (INN)
9709082458
State registration number (OGRN)
1227700374660
Date of foundation
Offices
Moscow (head office), St Petersburg, Perm, Krasnodar, Podolsk
SRO membership
design documentation (); construction, reconstruction and major repairs ()
Supplier register
register of potential suppliers of the Gazprom Group on the GPB electronic platform ()
SRO membership: construction, reconstruction and major repairs
Number
1756
Issued
07.08.2025
SRO
EnergoStroyAlliance Association of Construction Organisations (SRO-S-089-27112009)
Member since
7 August 2025
Scope
capital construction facilities, including especially hazardous, technically complex and unique ones (except nuclear facilities); first level of liability — up to RUB 90 million
For: high-voltage tests with partial-discharge measurement of the 400 kV GIS and 400 kV gas-insulated busducts during…
Full letter description
high-voltage tests with partial-discharge measurement of the 400 kV GIS and 400 kV gas-insulated busducts during energisation of the right-hand part of the 400 kV GIS at Akkuyu NPP. Letter dated 22.12.2025, No. 2-СЕ/49068.
“AKKUYU NÜKLEER ANONİM ŞİRKETİ expresses its gratitude to Energy Management LLC for the high professionalism and quality of the services provided in carrying out high-voltage tests with partial-discharge measurement of the 400 kV GIS and the 400 kV gas-insulated busducts…”
Novovoronezh NPP, a branch of Rosenergoatom Concern JSC
For: prompt, high-quality emergency repair work to replace a circuit breaker at the 500 kV Donskaya substation of unit 2 of…
Full letter description
prompt, high-quality emergency repair work to replace a circuit breaker at the 500 kV Donskaya substation of unit 2 of Novovoronezh NPP-2. Letter dated 21.11.2025, No. 9/Ф0701/203022.
“Effective action in repairing the 500 kV switchgear made it possible to avoid downtime of the main equipment and to prevent any reduction in power output.”
For: high professionalism, responsibility and promptness in the high-voltage tests of the 400 kV GIS with partial-discharge…
Full letter description
high professionalism, responsibility and promptness in the high-voltage tests of the 400 kV GIS with partial-discharge measurement (bay No. 13 and the section busbars of the right-hand part of the GIS) at the Akkuyu NPP site.
“I would like to note the well-coordinated work of the team of supervising engineers on the tests at the Akkuyu NPP site, their readiness to accommodate the Customer’s wishes, their diligence and their ability to find solutions in difficult situations in order to meet the work deadlines.”
Cookies and Yandex MetricaNecessary cookies keep the site working. Analytics is optional. Embedded Google maps load automatically. Cookies and settings