Power and process equipment
We select and supply gas and steam turbines from 8 kW to 308 MW, API 617–619 compressors up to 30 MW, microturbines and high-voltage equipment for 110–550 kV. Deep product knowledge, partnerships with manufacturers, our own logistics and experience in export and import operations let us find the best way to deliver.
A logarithmic axis from 8 kW to 308 MW: move the slider and the matching families are highlighted
Equipment categories

Siemens Energy SGT-100 – SGT-800 gas turbines, 5–62 MW
Siemens Energy industrial gas turbines in two groups: small SGT-100 – SGT-400 (5–15 MW) and medium SGT-600 – SGT-800 (24–62 MW). They suit power generation as well as compressor and pump drive duty in the oil and gas industry. Simple-cycle efficiency up to 41.1%, NOx with dry low emissions combustion from 9 to 25 ppm. We select the machine for the duty, supply and service it.
5–62 MW · 7 models

Steam turbines 8 kW – 80 MW
Machines for driving compressors, pumps, fans and other equipment and for generating power, rated from 8 kW to 80 MW. Condensing and back-pressure designs, with steam extraction; built to API 611/612 and NEMA SM23; steam up to 540 °C and 14 MPa. We select the machine for the duty and supply it.
8 kW – 80 MW · 3 series

Industrial compressors: centrifugal, reciprocating, screw, diaphragm
Centrifugal, reciprocating, screw and diaphragm compressors for a wide range of processes and gases. We size and select the machine for the duty: pressure up to 50 MPa, flow up to 300,000 Nm³/h, driver power up to 30 MW; hydrocarbons, hydrogen, CO₂, ammonia, air and nitrogen; manufactured to API 617, 618, 619, 672 and 673.
up to 30 MW · 6 types

Gas microturbines 110–1,966 kW
An efficient, reliable and clean solution for distributed power supply and waste heat recovery. Small size and weight, mobility, scalability, operation on different fuels, low noise and emissions, long intervals between service visits and remote monitoring. Three series — 135, 390 and 2100 — in simple cycle and with a recuperator.
110–1,966 kW · 3 series

High-voltage equipment 110–550 kV: circuit breakers and GIS
Dead-tank and live-tank SF6 circuit breakers for 72.5–550 kV and gas-insulated switchgear for 145, 245 and 330–550 kV. The assembly plant is designed to build up to 350 circuit breakers a year; the service centre supports the equipment throughout its life. Versions for operation from −60 to +55 °C.
110–550 kV · circuit breakers and GIS
Which equipment for which duty
| Duty | Equipment | Range | Standards |
|---|---|---|---|
| Captive power plant, peaking and reserve source | Gas turbines | 5–62 MW | — |
| Driving compressors and pumps with steam | Mechanical drive steam turbines | 8 kW – 50 MW | API 611/612 |
| Generating power from steam | Steam turbine generator sets | 2.5–80 MW | API 612, NEMA SM23 |
| Driving pumps and fans, starter duty | Small steam turbines RLA, RLVA, RLH | up to 1,865 kW | — |
| Compressing hydrocarbons, hydrogen, CO₂, ammonia, air, nitrogen | Compressors | up to 50 MPa · up to 300,000 Nm³/h · up to 30 MW | API 617, 618, 619, 672, 673 |
| Distributed generation, waste heat recovery | Gas microturbines | 110–1,966 kW | — |
| Switching and distribution at 110–500 kV | SF6 circuit breakers and GIS | 72.5–550 kV · up to 63 kA | — |
Not found what you need? Describe the duty
We will size and select equipment for your process data.
Projects with this equipment
All projects
Akkuyu NPP: high-voltage testing of 400 kV GIS and SF6 bus ducts
400 kV GIS · 400 kV SF6 bus ducts

Arctic LNG 2: installation and commissioning of feed gas and boil-off gas compressors
feed gas compressors · boil-off gas compressors

Belenergo: installation and commissioning supervision of 11 SGT-800 gas turbine units
11 × SGT-800 · full load in 15 minutes

Ilim: board machine control system in Ust-Ilimsk
board machine of 600,000 tonnes a year · 2023

Knauf Petroboard: CHP steam boiler automation
steam boiler control system on SIMATIC PCS7

Rosseti: GIS for the 220 kV TsRP substation in Krasnoyarsk
1,920 sets of GIS equipment

USC: electrical equipment for three fishing vessels
3 vessels · power distribution and monitoring system based on PMA300 · 2020–2023

Yamal LNG: eight SGT-800 gas turbines, boil-off gas compressors and 29 modular substations
8 × SGT-800 · 4 boil-off gas compressors · 29 modular substations
Questions and answers
Whose equipment do you supply?
We work with foreign manufacturers under partnership agreements: representative of Hangzhou Chinen Turbomachinery, New JCM Group and Qingdao Herui Compressor. Third-party manufacturer names are given as plain text; trademarks belong to their owners.
What is the service life of GIS?
Over 50 years, with SF6 leakage of not more than 0.1% a year.
In what climatic conditions do the circuit breakers work?
From −60 to +55 °C.
Catalogues and enquiry data sheets
Manufacturer names and designations are given to identify the equipment we supply and service. Trademarks belong to their respective owners. Energy Management LLC is an independent service company.