Control systems for gas turbines and compressors
We design, build and commission control systems for gas turbine units, steam turbines and compressor trains: engineering to Russian standards, application software, control cabinets, factory acceptance tests and commissioning on site. Platforms — Siemens Energy SPPA-T3000, SIMATIC PCS 7, TIA Portal and the Russian Ezan platform with Katren and Sonet controllers.

Key facts
- Machines: gas turbine units, steam turbines, centrifugal and reciprocating compressors.
- Full cycle: design, application software, control cabinets, factory acceptance tests, commissioning.
- Engineering to Russian standards by specialists with international experience.
- Platforms: SPPA-T3000, SIMATIC PCS 7, TIA Portal, the Russian Ezan platform (Katren, Sonet).
- Vibration monitoring and speed control systems are part of the control system.
- Before work on site, the control system is tested on a model of the machine. Example: testing of the digital model of the 2.4 MW Howden steam turbine has been completed to prepare the control system for commissioning.
What the control system does
- Start-up and shutdown
- automatic sequences for start-up, normal and emergency shutdown of the machine
- Control
- speed, load, pressure and flow — within temperature and vibration limits
- Protection
- process protections and interlocks on machine and auxiliary system parameters
- Vibration monitoring and speed control
- systems monitoring vibration, axial displacement and speed, with signals to the protections
- Anti-surge control
- for compressors — the surge line and bypass control; see the separate page
- Visualisation
- mimic diagrams, trends, event archive; interface to the plant control system and dispatching
How the control system runs a gas turbine unit and a compressor train
The control system takes the machine through a set programme, from readiness checks to operation under load and back to shutdown. For gas turbine units at power plants this is a direct requirement of the Rules for the Technical Operation of Power Plants and Networks of the Russian Federation (Order of the Russian Ministry of Energy No. 1070 of 4 October 2022, clause 285): start-up, synchronisation, loading and normal shutdown from any thermal state are performed automatically to a set programme.
Typical gas turbine start-up sequence
- Readiness checks: lube oil system, fuel system, valve positions, no active trips or interlocks.
- Cranking by the starting device and purging of the gas path, so that no fuel remains in it.
- Fuel ignition and flame monitoring in the combustors.
- Acceleration, disengagement of the starting device and transition to no-load operation.
- Synchronisation with the grid and loading; for a mechanical drive gas turbine, run-up to the compressor’s operating speed.
Main gas turbine control loops: speed and load; rotor acceleration during start-up; gas temperature limiting, so that the temperature never reaches the trip setpoint. All of them act on fuel flow: the loop that calls for the least fuel is the one in control. A separate loop positions the compressor inlet guide vanes: during start-up to keep the compressor out of surge and, on units with a heat recovery steam generator, also at part load to hold the exhaust gas temperature. On units with dry low-emission combustors, the control system also switches between combustion modes.
On a compressor train, the control system maintains gas pressure or flow by driver speed, guide vanes, suction throttling or recycle. It works together with anti-surge control, load sharing between parallel units and monitoring of the auxiliary systems — the lube oil system and the dry gas seals.
Control and protection requirements: what is checked at acceptance
Control and protection requirements for power plant gas turbine units are set by Chapter XX of the same Rules. The control system is tuned and accepted against these values after erection or modernisation.
| Requirement | Value | Clause |
|---|---|---|
| Speed droop | 4–5% of rated speed; local droop not below 2% | 281 |
| Speed control dead band | no more than 0.2% of rated speed at any load | 281 |
| Dead band of gas temperature limiting | no more than 10 °C | 281 |
| Instantaneous rejection of maximum load to zero | speed stays below the overspeed trip setting | 281 |
| Gas path purge before ignition | at least 2 min on liquid fuel and 5 min on gaseous fuel; after a failed start, at least 4 and 10 min | 288 |
| Control platform failure that makes it impossible to control or monitor all gas turbine equipment | immediate trip of the unit by protections or operators | 293 |
| Control system test by instantaneous load rejection (disconnecting the generator from the grid) | at acceptance after erection; after reconstruction that changes the dynamic characteristic of the unit or the control characteristics; when changes in them are found in service or during repair | 296 |
The purge times in the table apply to gas turbines that are not part of a heat-supplying gas turbine unit or a combined cycle plant. For foreign-made steam turbines in service and those built before 1991, the Rules set a speed droop of 4–5% (4.5–6.5% for type R back-pressure turbines) and a speed dead band of no more than 0.3% (clause 265).
On oil, gas and chemical projects, protection of the machine itself is usually built to API 670 “Machinery Protection Systems” (6th edition, 2025). Each radial bearing carries two proximity probes mounted 90° apart, rotor axial displacement is monitored by two probes with 2-out-of-2 voting, and overspeed protection is built on independent speed channels with 2-out-of-3 or 1-out-of-2 voting. Surge detection under API 670 is a back-up protection in case the primary anti-surge system fails. Vibration is evaluated against the manufacturer’s limits and ISO 20816 (machines with fluid-film bearings): Part 2 covers land-based gas and steam turbines and generators above 40 MW, Part 4 gas turbines above 3 MW. At power plants, the decision to shut down a gas turbine for vibration is taken against the values in the site operating instructions (clause 298 of the Rules).
How we run a project
- 1
Survey
- 2
Engineering
- 3
Application software
- 4
Control cabinets
- 5
Factory acceptance tests
- 6
Commissioning
Platforms
- Siemens Energy SPPA-T3000
- control systems of power units and turbine generators: support, modernisation, staged replacement
- SIMATIC PCS 7 and TIA Portal
- application software, cabinets, factory acceptance tests — example: a steam boiler control system on PCS 7
- Ezan platform
- a Russian control platform with Katren and Sonet controllers — for new control systems and migration
- Vibration monitoring
- vibration and speed monitoring systems integrated into the machine control system
Modernising a control system without replacing the turbine or compressor
Modernisation and repair of control systems are part of the company’s service offering. In a control system upgrade, the control part is replaced while the machine itself — the turbine or compressor — is kept, and, depending on the survey results, so are the sensors, actuators and field cabling.
- Replaced: controllers, input/output modules, control and protection cabinets, operator stations and application software.
- Transferred: start-up and shutdown sequences, protection setpoints and controller settings; they are recovered during the survey of the existing system and checked against the manufacturer’s documentation.
- Tested: the new software at the factory acceptance tests of the cabinets and on a model of the machine, then on site — signal channels, protections and interlocks acting on the final control elements.
The cut-over to the new system is timed to a planned outage of the unit. If the upgrade changes the characteristics of a power plant gas turbine’s control system, the Rules require a subsequent instantaneous load rejection test (clause 296). Transferring a control system from SPPA-T3000 and PCS 7 is described on the migration to a Russian control platform page, and testing on a model on the digital twins and simulators page.
What to prepare for an upgrade assessment
- type, manufacturer and operating modes of the machine;
- the platform of the existing control system, the software version and whether the application software project is available;
- the input/output list, diagrams and protection setpoint lists;
- records of failures and trips over recent years;
- dates of the next planned outages.
Track record
Model of a 2.4 MW steam turbine with nozzle-group governing
testing of the digital model of the 2.4 MW Howden steam turbine completed to prepare the control system for commissioning
Pulp and paper, power · KommunarKnauf Petroboard: steam boiler control system
application software on SIMATIC PCS 7, control cabinets, factory acceptance tests
MigrationReplacing SPPA-T3000 and PCS 7 with a Russian platform
survey, development, bench testing, commissioning
Gas turbine control platform maintenance: the Kirov CHP-3 example
The company’s specialists provided maintenance services for the gas turbine control platform — the hardware and software of the gas turbine unit control system — at Kirov CHP-3, part of the Kirovsky branch of T Plus PJSC. The services were provided under a contract of 10 April 2023 for technical support, assistance and supervision of the maintenance procedures for the gas turbine control platform. In letter No. 50300-27-00079 of 20 March 2025, the customer wrote: “The work performed by your organisation’s specialists, together with the conclusions and recommendations provided in consultations and service reports, made it possible to achieve highly efficient operation of the gas turbine control system and of the System as a whole, as well as its failure-free operation” (translated from Russian). The scan of the letter is on the customer letters of appreciation page.
What control platform maintenance usually includes
- backups of the application software and configuration, with change tracking;
- checks of module self-diagnostics and switchover to redundant controllers, networks and power supplies;
- checks of measurement channels and protection setpoints;
- checks of protections and interlocks before start-up after a repair: for gas turbine units after a repair lasting more than 3 days, clause 286 of the Rules requires this;
- review of event archives and trips, with recommendations on operation.
For systems based on SPPA-T3000, the company has a test bench for control platforms, with controller, server and network hardware and all versions of the SPPA-T3000 software available in Russia. The company also offers remote monitoring and diagnostics of turbine units: online data analysis and advice to operating staff in abnormal and emergency situations over secure channels. How remote access to control systems is protected is described on the cybersecurity for industrial control systems page.
Related
Questions and answers
Can the control system be built on a Russian platform?
Yes: new control systems and replacements are built on the Ezan platform with Katren and Sonet controllers; where needed we keep supporting SPPA-T3000 and PCS 7.
How are the algorithms checked before start-up?
At the factory acceptance tests of the cabinets and on a model of the machine. Example: testing of the digital model of the 2.4 MW Howden steam turbine has been completed to prepare the control system for commissioning.
Is vibration monitoring part of the control system?
Yes, vibration monitoring and speed control systems are supplied as part of the control system or integrated with existing ones.
Whose equipment do you build control systems for?
For turbines and compressors from different manufacturers: the platform and scope of work are chosen after a survey of the machine. The company’s service team maintains the control, vibration monitoring and speed control systems of steam turbines and compressor units, and modernisation and repair of control systems are part of its service offering.
What tests does a control system undergo after an upgrade?
First, factory acceptance tests of the cabinets and application software testing on a model of the machine. On site, measurement channels, protections and interlocks are checked acting on the final control elements, followed by start-up and operation under load. If the upgrade changes the control characteristics of a power plant gas turbine, the Rules for the Technical Operation of Power Plants and Networks require an instantaneous load rejection test with the generator disconnected from the grid (clause 296).
How does an API 670 protection system differ from the control system?
The control system runs the machine: it starts it, controls the operating point and shuts it down. An API 670 machinery protection system continuously monitors vibration, rotor axial displacement, speed and bearing temperatures and issues a trip command based on sensor voting. It may be supplied as part of the control system, but on critical machines it works independently of the control system’s controllers, which receive its signals for alarms, interlocks and the event archive.
Expert in charge
Process control systemsManufacturers’ names and designations are used to identify the equipment we supply and service. Trademarks belong to their respective owners. Energy Management LLC is an independent engineering company.