Vibration diagnostics and balancing of turbomachinery
We measure and analyse the vibration of gas and steam turbines and compressors at operating conditions, find the cause and remove it by field balancing of the rotor, alignment and support adjustment. We service vibration monitoring and overspeed systems. Early detection of defects from vibration allows repairs to be planned before a failure.

Scope
- vibration measurement at operating conditions, start-ups and shutdowns
- spectrum analysis and identification of the cause of excessive vibration
- field balancing of the rotor
- shaft train alignment and support adjustment
- checking and setting of vibration monitoring and overspeed systems
- assessment of the influence of the foundation and adjacent equipment
- recommendations on removing the causes and on monitoring intervals
- a technical report with the measurements
Which defects vibration diagnostics detects
Vibration diagnostics of machinery answers the question of why vibration has increased. Most defects of turbines and compressors leave their own trace in the signal: a component at a particular frequency, the behaviour of the phase, the shape of the shaft orbit. This trace makes it possible to tell unbalance from misalignment, and a bearing defect from a rub, before the machine is opened up. The cause is confirmed by how vibration changes during start-up, coast-down and at different loads.
| Defect | Signs in the signal | Usual remedy |
|---|---|---|
| Rotor unbalance | the component at running speed dominates, the phase is stable | field or shop balancing |
| Shaft train misalignment | components at running speed and twice running speed, higher axial vibration near the coupling | alignment allowing for thermal growth |
| Oil whirl in a fluid-film bearing | a subsynchronous component at about 0.4–0.48 of running speed | check of bearing clearances, oil pressure and oil temperature |
| Bearing shell wear | a shift of the shaft centreline in the clearance (from the DC gap voltage of the proximity probes) | replacement or re-babbitting of the bearing shell |
| Rolling-element bearing defects | defect frequencies of the races, rolling elements and cage in the envelope spectrum | bearing replacement at a planned shutdown |
| Rub in seals | subharmonics and harmonics, slow phase drift due to thermal bow of the shaft | check of seal clearances |
| Looseness, frame or foundation resonance | multiple harmonics of running speed, different vibration at adjacent points of a joint; with resonance, the amplitude rises and the phase shifts when running speed is close to a natural frequency of the structure | tightening of fixings, check of supports and foundation, detuning from resonance |
| Compressor surge or rotating stall | low-frequency components, pressure and flow pulsations | check of the operating point and anti-surge protection |
Bearing vibration diagnostics. Fluid-film bearings of turbines and centrifugal compressors have large clearances, and only part of the shaft vibration reaches the bearing housing, so it is measured by non-contact probes as vibration relative to the bearing: they show the journal position in the clearance and the orbit. Rolling-element bearings, used in aeroderivative gas turbines, pumps and electric motors, are diagnosed from the envelope spectrum: defect frequencies appear before the overall vibration level rises.
How the work proceeds
- 1
Request
Model, serial number, running hours, the concern.
- 2
Survey
Measurements at operating conditions, analysis of spectra and trends.
- 3
Work programme
Scope, operating modes and personnel agreed with the customer.
- 4
Execution
Balancing, alignment, setting of the monitoring systems.
- 5
Report
Technical report with measurements and recommendations.
What to prepare for the survey and what the report contains
The more data on the machine we receive before the visit, the more precise the measurement programme and the fewer start-ups and shutdowns are needed on site. If vibration is part of a wider picture of wear, it is analysed together with an inspection and diagnostic survey of the machine.
What to attach to the request
- the model, serial number, operating speed and bearing type;
- the vibration monitoring sensor layout, alarm and trip setpoints;
- vibration trends for recent months, and start-up and coast-down records if the system stores them;
- information on recent repairs, replacement of rotor parts and alignment;
- the operating modes and loads that can be provided during the measurements.
What the technical report usually contains
- a diagram of measurement points and directions, and the machine operating modes;
- spectra, phase, shaft orbits, start-up or coast-down plots;
- evaluation of vibration against the manufacturer’s limits and standards;
- the cause of vibration and recommendations on removing it;
- after balancing, vibration before and after the work, and the correction weights fitted and their positions.
Field balancing and alignment
Field balancing is carried out when the cause of vibration is unbalance and removing the rotor is impractical: after replacement of rotor parts or a repair, or when the unbalance only shows at operating speed. The rotor is balanced in its own bearings without dismantling the machine.
- Confirm that the cause is unbalance and not a rub, loose supports or misalignment: balancing does not remove them, it only masks them.
- Choose correction planes accessible without opening the casing, and the operating mode at which vibration is compared.
- Run the machine with trial weights and calculate the correction weights from the change in amplitude and phase.
- Fit the weights and check vibration at the operating modes, during start-up and coast-down.
Each trial run means a shutdown and a new start-up, so their number and time windows are agreed with the operating staff in advance. ISO 21940-13:2012 describes when in-situ balancing of a medium or large rotor is appropriate and sets requirements for instrumentation, safety, reporting and record keeping.
Alignment of the turbine, gearbox, generator or compressor shafts is done with laser alignment systems or with dial indicators across the coupling halves. Cold offsets are set from the manufacturer’s data: they compensate for thermal growth so that the shafts are in line in operation.
Causes of excessive vibration
What we most often find
- operation outside the design conditions
- wear or damage of components: bearings, seals, blades
- poor maintenance and assembly errors
- foundation defects and loose fixings
- the influence of adjacent equipment and pipework
What early detection gives
- repairs are planned before a failure
- fewer unplanned shutdowns
- spare parts are ordered in advance
Permanent monitoring and periodic measurements
A permanent vibration monitoring system protects the machine, while periodic measurements and diagnostics explain what is happening to it.
Requirements for permanent protection systems are set by API 670 (6th edition, July 2025), one of the API standards for machinery. It covers shaft and casing vibration, rotor axial position, speed and overspeed protection, surge detection and bearing temperatures. Radial vibration is usually measured by two non-contact probes 90° apart at each bearing, and electronic overspeed protection uses three independent channels with two-out-of-three voting.
| Permanent system | Periodic measurements | |
|---|---|---|
| Purpose | protection: alarm and trip at setpoints | finding the cause, assessing how a defect develops |
| Sensors | built-in: at the shaft, on bearing housings, axial position and speed | a portable analyser or buffered outputs of the permanent system |
| When | continuously | to a schedule, after a repair, when vibration rises |
| Result | signals to the control and protection systems, trends | spectra, phase, orbits, conclusions and recommendations |
The vibration monitoring and overspeed systems of steam turbines and compressor trains are among the equipment we service. Sensors, proximity probes and spares for the vibration monitoring systems of Siemens Energy and Dresser-Rand compressor trains and steam turbines are supplied as spare parts. An outdated system is replaced or integrated during an upgrade of the gas turbine and compressor control system.
Vibration limits: ISO 20816 and the Russian operating rules
The first reference is the manufacturer’s limits in the operating manual: the alarm and trip setpoints are based on them. General criteria are given by the ISO 20816 series; in Russia, the identical GOST R ISO 20816 national standards apply.
The standards divide vibration into four zones. A: typically new, recently commissioned machines. B: suitable for unrestricted long-term operation. C: unsatisfactory for long-term continuous operation; the machine may run for a limited period until a repair. D: vibration severe enough to damage the machine. For machines above 300 kW, GOST R ISO 20816-3-2023 gives the A/B, B/C and C/D boundaries as 2.3, 4.5 and 7.1 mm/s on rigid supports and 3.5, 7.1 and 11.0 mm/s on flexible supports (r.m.s. vibration velocity on bearing housings, 10–1000 Hz). These values are general guidance, not acceptance criteria.
A change in vibration matters too: a change of more than 25 % of the B/C boundary is regarded as significant, especially if it is sudden, even when that boundary has not yet been reached.
| Machine | Standard |
|---|---|
| Land-based gas turbines above 3 MW with fluid-film bearings, except aeroderivatives and turbines covered by Part 2 | ISO 20816-4:2018, GOST R ISO 20816-4-2022 |
| Land-based gas and steam turbines and generators above 40 MW at 1500, 1800, 3000 or 3600 r/min | ISO 20816-2:2017, GOST R ISO 20816-2-2022 |
| Steam turbines up to 40 MW, rotary compressors, industrial gas turbines up to 3 MW | ISO 20816-3:2022, GOST R ISO 20816-3-2023 |
| Reciprocating compressor systems | ISO 20816-8:2018, GOST R ISO 20816-8-2023 |
For steam turbines at power plants, the limits are set by the Rules for the Technical Operation of Power Plants and Networks of the Russian Federation (Order of the Russian Ministry of Energy No. 1070 of 4 October 2022, clause 277): r.m.s. vibration velocity of the bearing supports must not exceed 4.5 mm/s, and if it does, measures to reduce it are taken within 30 days; above 7.1 mm/s, the unit may not run for more than 7 days; at 11.2 mm/s or more, the turbine is tripped unless the manufacturer has set a different value. For gas turbines, the Rules refer to the values in the site operating instructions (clause 298).
Related pages
Questions and answers
How does balancing differ from diagnostics?
Diagnostics finds the cause: measurement and analysis. <a class="term-link" href="../glossary/vibration-diagnostics/index.html" title="What is vibration diagnostics">Balancing</a> and adjustment remove it: balancing, alignment, support and monitoring system settings.
Do you work with vibration monitoring systems from different manufacturers?
Yes: we check and set the vibration monitoring and overspeed systems of steam turbines and compressor trains from the manufacturers we service. <a class="term-link" href="../glossary/spare-parts/index.html" title="What spare parts are and how their origin is confirmed">Spares</a> for vibration monitoring systems are supplied for Siemens Energy and Dresser-Rand compressor trains and steam turbines.
Does the machine have to be shut down for field balancing?
Measurements and analysis are carried out with the machine running, but balancing requires shutdowns. Each trial run means stopping the machine, fitting a trial weight and starting it again; after the correction weights are fitted, the machine is started once more and vibration is checked at all operating modes. The number of runs and their time windows are agreed with the operating staff in advance, to fit into planned shutdowns where possible.
Which standards are used to evaluate turbine vibration?
First of all, the manufacturer’s limits in the operating manual. General evaluation zones A–D are given by ISO 20816 and the identical Russian GOST R ISO 20816 standards; the part of the standard is chosen by machine type and output. For steam turbines at power plants, the 4.5, 7.1 and 11.2 mm/s limits are set by clause 277 of the Russian Rules for the Technical Operation of Power Plants and Networks.
Engineering team
Rotating equipment service