What is partial discharge
Partial discharges are local electrical discharges in insulation that bridge only part of the gap between the electrodes: in a gas void, at a sharp edge, near a particle or a crack. By themselves they do not cause breakdown, but they gradually destroy the insulation, so their level is an indicator of the condition of the equipment.
Key facts
- A local discharge across part of the insulation — not a breakdown, but a sign of a defect.
- Its magnitude is assessed as apparent charge in picocoulombs (pC).
- Methods: electrical (IEC 60270), acoustic and UHF.
- In GIS the main sources are metal particles and assembly defects.
- Measurement is combined with the high-voltage withstand test.
Where they come from
At a defect the field strength is higher than in the rest of the insulation: near a metal particle or a burr, in a gas bubble inside cast or oil-paper insulation, at a layer boundary, at a poorly connected screen. When the local field exceeds the strength of the medium, a short discharge lasting nanoseconds occurs. It repeats every half-cycle of the voltage, releases heat, ozone and decomposition products and year after year enlarges the defect up to breakdown.
Measurement methods
Electrical — measurement of the discharge current pulses through a coupling capacitor with the apparent charge assessed in picocoulombs; used during high-voltage tests to IEC 60270. Acoustic — sensors on the enclosure pick up the ultrasound of the discharge and locate the defect. UHF — high-frequency sensors in the GIS enclosure register the electromagnetic pulses of the discharges; used for acceptance testing and permanent monitoring. The methods complement each other: the electrical one gives a quantitative value, the acoustic and UHF ones give the location.
Why measure in GIS
In SF6 insulation the main source of discharges is free metal particles and assembly defects left after erection. Partial discharge measurement during the on-site high-voltage test reveals them before the operating voltage is applied; the result is a statement of readiness of the bay. In service, periodic measurements show the development of defects and allow repairs to be planned before failure.
What counts as normal
The permissible level is set by the manufacturer and the apparatus standard: for GIS and SF6 breakers a few picocoulombs at test voltage, for transformers and cable joints their own limits. Not only the value matters but also the pattern: growth between measurements and dependence on voltage point to a developing defect.
Where it appears on this site
The company’s test laboratory measures partial discharges during on-site tests of GIS, circuit breakers, current and voltage transformers up to 750 kV; the 400 kV GIS and SF6 bus ducts at the Akkuyu NPP were tested this way.
Questions and answers
Why are partial discharges dangerous?
Each discharge releases heat, ozone and decomposition products and slowly erodes the insulation. It does not cause breakdown by itself, but the defect grows year after year until the insulation fails in service under operating voltage. That is why partial discharges are measured before energisation and periodically in operation.
What units are partial discharges measured in?
The main quantity is apparent charge in picocoulombs (pC), determined by the electrical method of IEC 60270. Acoustic and UHF methods give signals in their own units and are used mainly to locate the defect and for continuous monitoring.
Which equipment is checked for partial discharge?
GIS and SF6 bus ducts, SF6 circuit breakers, instrument and power transformers, cable lines. The Energy Management test laboratory measures partial discharges during tests of GIS, circuit breakers and instrument transformers up to 750 kV. For continuous monitoring in service, GIS is fitted with UHF sensors and a monitoring system.
Related terms